We were going to use an indirect thermal desorbtion unit with a secondary AB to handle the dioxins and the hydrocarbons, with a back end cyclone and baghouse to cut down on waste bulk. I was going to run the output through a pug with basically a portland mix to stabilize the metals, which would have given the building contractor an incredible sub-base product. I was teamed with Gammon-Skanska for the bid, we unfortunately lost. More of how business gets done in China, than anything wrong with our bid. Very Maciavellian. But I DID get to spend more than a month in Hong Kong, with excellent hosts with a lot of money. Darlene got to spend the trip with me. Good, good times. And happy memories.