‘Ranalli added, “We completed the excavation over 500,000 cubic yards of material, came out to create the hole. We’ve got about 40-50% of the foundations already poured in place now the steel start and sort of chase that around the bowl. As we complete, the steel will go around level by level over the next year or so.”‘